Class inaugurates a new warehouse

Class inaugurates a new warehouse inside Castel San Giovanni Logistics Center.

The Warehouse, with a covered area of ​​32,000 square meters, will host the Handling and Quality Control activities of both Raw Materials and Finished Products for a customer in the Fashion&Luxury sector.

It is an eco-friendly property (BREEAM environmental certification), equipped with main systems that allow to obtain benefits in terms of energy saving and environmental impact: from the eco-friendly and insulating materials used in the construction of the 1.2 MWp photovoltaic system installed, to the LED lighting system; from the use of servomotors equipped with lithium-ion batteries to the installation of electric charging columns for means of transport.

 


About the logistical processes managed in the new warehouse, in addition to traditional intensive stock, an automatic line for the control and cutting of fabrics will be implemented.

The automatic line will allow the transfer of the pieces of fabric, through the reading of Rfid matricular tags, between the individual workstations: control, cutting, packaging and sorting. These last 2 stages are fully automated.

After an intense and interesting planning phase in partnership with the customer, the Start-Up is currently underway.

The gradual transfer of products and the implementation of processes will not cause any interruption of the service, in terms of shipping the raw materials to the façons and the finished products to the end customers.